Log in
Language:

MERAL Myanmar Education Research and Learning Portal

  • Top
  • Universities
  • Ranking
To
lat lon distance
To

Field does not validate



Index Link

Index Tree

Please input email address.

WEKO

One fine body…

WEKO

One fine body…

Item

{"_buckets": {"deposit": "dba5d441-c007-4635-bd88-05cc4004b89e"}, "_deposit": {"id": "4895", "owners": [], "pid": {"revision_id": 0, "type": "recid", "value": "4895"}, "status": "published"}, "_oai": {"id": "oai:meral.edu.mm:recid/4895", "sets": ["user-ucsy"]}, "communities": ["ucsy"], "item_1583103067471": {"attribute_name": "Title", "attribute_value_mlt": [{"subitem_1551255647225": "Duration Control System for Construction Project Using PERT", "subitem_1551255648112": "en"}]}, "item_1583103085720": {"attribute_name": "Description", "attribute_value_mlt": [{"interim": "The Program Evaluation and ReviewTechnique (PERT) has been widely used as a toolfor project management. In PERT analysis, theactivity time distribution is assumed to be a betadistribution, and the mean and variance of theactivity time are estimated. These support thecritical path and the probability of the wholeproject. With the information of mean and varianceof critical path, which is assumed as normallydistributed, the probability of completion of aproject with specified dates can compute. Toestablish a PERT Cost, one first develops aframework for gathering cost data for each activity.Using the Optimum Time- Cost Estimate Conceptof Resource Allocation Supplement method of CostEstimation, one can find the minimum cost forspecific completion dates. The system in this papergives the expected duration, critical path,probability and time-cost estimates of the wholeproject using the application of BridgeConstruction."}]}, "item_1583103108160": {"attribute_name": "Keywords", "attribute_value": []}, "item_1583103120197": {"attribute_name": "Files", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_access", "date": [{"dateType": "Available", "dateValue": "2019-07-12"}], "displaytype": "preview", "download_preview_message": "", "file_order": 0, "filename": "psc2010paper (106).pdf", "filesize": [{"value": "84 Kb"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 84000.0, "url": {"url": "https://meral.edu.mm/record/4895/files/psc2010paper (106).pdf"}, "version_id": "ef4526f6-c75c-45fa-ba5d-ef6c737861ba"}]}, "item_1583103131163": {"attribute_name": "Journal articles", "attribute_value_mlt": [{"subitem_issue": "", "subitem_journal_title": "Fifth Local Conference on Parallel and Soft Computing", "subitem_pages": "", "subitem_volume": ""}]}, "item_1583103147082": {"attribute_name": "Conference papers", "attribute_value_mlt": [{"subitem_acronym": "", "subitem_c_date": "", "subitem_conference_title": "", "subitem_part": "", "subitem_place": "", "subitem_session": "", "subitem_website": ""}]}, "item_1583103211336": {"attribute_name": "Books/reports/chapters", "attribute_value_mlt": [{"subitem_book_title": "", "subitem_isbn": "", "subitem_pages": "", "subitem_place": "", "subitem_publisher": ""}]}, "item_1583103233624": {"attribute_name": "Thesis/dissertations", "attribute_value_mlt": [{"subitem_awarding_university": "", "subitem_supervisor(s)": [{"subitem_supervisor": ""}]}]}, "item_1583105942107": {"attribute_name": "Authors", "attribute_value_mlt": [{"subitem_authors": [{"subitem_authors_fullname": "Myint, Khine Pa Pa"}, {"subitem_authors_fullname": "Tun, Khin Mo Mo"}]}]}, "item_1583108359239": {"attribute_name": "Upload type", "attribute_value_mlt": [{"interim": "Publication"}]}, "item_1583108428133": {"attribute_name": "Publication type", "attribute_value_mlt": [{"interim": "Article"}]}, "item_1583159729339": {"attribute_name": "Publication date", "attribute_value": "2010-12-16"}, "item_1583159847033": {"attribute_name": "Identifier", "attribute_value": "http://onlineresource.ucsy.edu.mm/handle/123456789/797"}, "item_title": "Duration Control System for Construction Project Using PERT", "item_type_id": "21", "owner": "1", "path": ["1597824273898"], "permalink_uri": "http://hdl.handle.net/20.500.12678/0000004895", "pubdate": {"attribute_name": "Deposited date", "attribute_value": "2019-07-12"}, "publish_date": "2019-07-12", "publish_status": "0", "recid": "4895", "relation": {}, "relation_version_is_last": true, "title": ["Duration Control System for Construction Project Using PERT"], "weko_shared_id": -1}
  1. University of Computer Studies, Yangon
  2. Conferences

Duration Control System for Construction Project Using PERT

http://hdl.handle.net/20.500.12678/0000004895
http://hdl.handle.net/20.500.12678/0000004895
2674cf32-b48a-41ce-920b-f570e241deb1
dba5d441-c007-4635-bd88-05cc4004b89e
None
Preview
Name / File License Actions
psc2010paper psc2010paper (106).pdf (84 Kb)
Back
0
0
views
downloads
See details
Views Downloads

Versions

Ver.1 2020-09-01 15:28:10.610461
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Export

OAI-PMH
  • OAI-PMH DublinCore
Other Formats
  • JSON

Confirm


Back to MERAL


Back to MERAL