MERAL Myanmar Education Research and Learning Portal
Item
{"_buckets": {"deposit": "06350ee4-bcd4-4be9-9442-1f7f5fa55d40"}, "_deposit": {"created_by": 12, "id": "9390", "owner": "12", "owners": [12], "owners_ext": {"displayname": "", "username": ""}, "pid": {"revision_id": 0, "type": "depid", "value": "9390"}, "status": "published"}, "_oai": {"id": "oai:meral.edu.mm:recid/00009390"}, "author_link": [], "item_1583103067471": {"attribute_name": "Title", "attribute_value_mlt": [{"subitem_1551255647225": "Dams in Bago Township (1988-2010)", "subitem_1551255648112": "en"}]}, "item_1583103085720": {"attribute_name": "Description", "attribute_value_mlt": [{"interim": "Bago District is situated in the southern part of the Republic of the Union of Myanmar in Bago Region. Bago Township is situated in Bago District. But Bago Township is a place that is affected by floods every year. In Bago Township, where floods often occur, no dams were constructed by successive governments before1988.Since 1988, SLORC government has implemented and constructed small and medium-sized irrigation projects to control and prevent flooding and inundation of agricultural land in Bago Township, and to provide water in summer for year-round crops. According to these projects, nine dams were constructed in Bago Township. This paper is intended to investigate the dams in Bago Township (1988-2010). Bago Township is situated in Bago district, Bago Region. It is an area affected by flood in rainy season. Therefore the government constructed nine dams to prevent annual floods and natural disaster, fresh water supply, for greenery and high yield production of crops in Bago Township. The life of people changed for construction of dams, there are any environmental impacts and the voices of the local people."}]}, "item_1583103108160": {"attribute_name": "Keywords", "attribute_value_mlt": [{"interim": "dams"}, {"interim": "flood"}, {"interim": "electricity and environment"}]}, "item_1583103120197": {"attribute_name": "Files", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_access", "date": [{"dateType": "Available", "dateValue": "2024-04-17"}], "displaytype": "preview", "download_preview_message": "", "file_order": 0, "filename": "Win Win Cho (617 to 624).pdf", "filesize": [{"value": "363 KB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_0", "mimetype": "application/pdf", "size": 363000.0, "url": {"url": "https://meral.edu.mm/record/9390/files/Win Win Cho (617 to 624).pdf"}, "version_id": "84fdb979-0575-451a-9304-620ee016abb2"}]}, "item_1583103131163": {"attribute_name": "Journal articles", "attribute_value_mlt": [{"subitem_issue": "2022", "subitem_journal_title": "University of Yangon Research Journal", "subitem_pages": "617-624", "subitem_volume": "11, No. 1"}]}, "item_1583105942107": {"attribute_name": "Authors", "attribute_value_mlt": [{"subitem_authors": [{"subitem_authors_fullname": "Win Win Cho"}]}]}, "item_1583108428133": {"attribute_name": "Publication type", "attribute_value_mlt": [{"interim": "Journal article"}]}, "item_1583159729339": {"attribute_name": "Publication date", "attribute_value": "2022-12-31"}, "item_title": "Dams in Bago Township (1988-2010)", "item_type_id": "21", "owner": "12", "path": ["1582967414544"], "permalink_uri": "https://meral.edu.mm/records/9390", "pubdate": {"attribute_name": "Deposit date", "attribute_value": "2024-04-17"}, "publish_date": "2024-04-17", "publish_status": "0", "recid": "9390", "relation": {}, "relation_version_is_last": true, "title": ["Dams in Bago Township (1988-2010)"], "weko_shared_id": -1}
Dams in Bago Township (1988-2010)
https://meral.edu.mm/records/9390
https://meral.edu.mm/records/9390c1103629-1e8d-4e26-9af5-22090e8be9b6
06350ee4-bcd4-4be9-9442-1f7f5fa55d40
| Name / File | License | Actions |
|---|---|---|
|
|
| Publication type | ||||||
|---|---|---|---|---|---|---|
| Journal article | ||||||
| Title | ||||||
| Title | Dams in Bago Township (1988-2010) | |||||
| Language | en | |||||
| Publication date | 2022-12-31 | |||||
| Authors | ||||||
| Win Win Cho | ||||||
| Description | ||||||
| Bago District is situated in the southern part of the Republic of the Union of Myanmar in Bago Region. Bago Township is situated in Bago District. But Bago Township is a place that is affected by floods every year. In Bago Township, where floods often occur, no dams were constructed by successive governments before1988.Since 1988, SLORC government has implemented and constructed small and medium-sized irrigation projects to control and prevent flooding and inundation of agricultural land in Bago Township, and to provide water in summer for year-round crops. According to these projects, nine dams were constructed in Bago Township. This paper is intended to investigate the dams in Bago Township (1988-2010). Bago Township is situated in Bago district, Bago Region. It is an area affected by flood in rainy season. Therefore the government constructed nine dams to prevent annual floods and natural disaster, fresh water supply, for greenery and high yield production of crops in Bago Township. The life of people changed for construction of dams, there are any environmental impacts and the voices of the local people. | ||||||
| Keywords | ||||||
| dams, flood, electricity and environment | ||||||
| Journal articles | ||||||
| 2022 | ||||||
| University of Yangon Research Journal | ||||||
| 617-624 | ||||||
| 11, No. 1 | ||||||