Log in
Language:

MERAL Myanmar Education Research and Learning Portal

  • Top
  • Universities
  • Ranking
To
lat lon distance
To

Field does not validate



Index Link

Index Tree

Please input email address.

WEKO

One fine body…

WEKO

One fine body…

Item

{"_buckets": {"deposit": "b5144d1f-0ed3-48cc-9368-02b78557229c"}, "_deposit": {"created_by": 20, "id": "9230", "owner": "20", "owners": [20], "owners_ext": {"displayname": "", "username": ""}, "pid": {"revision_id": 0, "type": "depid", "value": "9230"}, "status": "published"}, "_oai": {"id": "oai:meral.edu.mm:recid/00009230", "sets": ["1582965639643"]}, "author_link": [], "item_1583103067471": {"attribute_name": "Title", "attribute_value_mlt": [{"subitem_1551255647225": "An Analysis on Costs and Benefits of the No.1 Bayint Naung Bridge (1989/90- 2014/15)", "subitem_1551255648112": "en"}]}, "item_1583103085720": {"attribute_name": "Description", "attribute_value_mlt": [{"interim": "Within Yangon City, the No.1 Bayint Naung Bridge is one of the infrastructure projects implemented since the late 1990s. This study aims to examine mainly the monetary benefits as well as other economic and social advantages gained from the No.1 Bayint Naung Bridge in Yangon. To analyze costs and benefits of the Bridge, financial costs and benefits from the side of public sector are taken into consideration. Net Present Value Method, Benefit-Cost Ratio Method and Pay- back Period Method are used. From the NPV analysis, it was found that the bridge project is worth implemented. Result from Cost Benefit Analysis shows that total benefit is greater than total construction cost, so the project was cost effective. Pay-back period method also shows that it takes to recover."}]}, "item_1583103108160": {"attribute_name": "Keywords", "attribute_value_mlt": [{"interim": "monetary benefits"}, {"interim": "costs and benefits analysis"}, {"interim": "net present value method"}, {"interim": "benefit - cost ratio method"}, {"interim": "pay-back period method"}]}, "item_1583103120197": {"attribute_name": "Files", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_access", "date": [{"dateType": "Available", "dateValue": "2023-12-12"}], "displaytype": "preview", "download_preview_message": "", "file_order": 0, "filename": "Yin Myo Oo, Prof., Dept of Economics.pdf", "filesize": [{"value": "193 KB"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_0", "mimetype": "application/pdf", "size": 193000.0, "url": {"url": "https://meral.edu.mm/record/9230/files/Yin Myo Oo, Prof., Dept of Economics.pdf"}, "version_id": "c88ec7d3-2fcc-46d3-b6df-d00b476371af"}]}, "item_1583103131163": {"attribute_name": "Journal articles", "attribute_value_mlt": [{"subitem_journal_title": "Meiktila University of Economics Research Journal", "subitem_pages": "21-34", "subitem_volume": "Vol. 8, N0.1"}]}, "item_1583105942107": {"attribute_name": "Authors", "attribute_value_mlt": [{"subitem_authors": [{"subitem_authors_fullname": "Yin Myo Oo"}]}]}, "item_1583108359239": {"attribute_name": "Upload type", "attribute_value_mlt": [{"interim": "Other"}]}, "item_1583108428133": {"attribute_name": "Publication type", "attribute_value_mlt": [{"interim": "Journal article"}]}, "item_1583159729339": {"attribute_name": "Publication date", "attribute_value": "2017-12-01"}, "item_title": "An Analysis on Costs and Benefits of the No.1 Bayint Naung Bridge (1989/90- 2014/15)", "item_type_id": "21", "owner": "20", "path": ["1582965639643"], "permalink_uri": "https://meral.edu.mm/records/9230", "pubdate": {"attribute_name": "Deposit date", "attribute_value": "2023-12-12"}, "publish_date": "2023-12-12", "publish_status": "0", "recid": "9230", "relation": {}, "relation_version_is_last": true, "title": ["An Analysis on Costs and Benefits of the No.1 Bayint Naung Bridge (1989/90- 2014/15)"], "weko_shared_id": -1}
  1. Yangon University of Economics
  2. Yangon University of Economics Research Journal and Universities Research Journal

An Analysis on Costs and Benefits of the No.1 Bayint Naung Bridge (1989/90- 2014/15)

https://meral.edu.mm/records/9230
https://meral.edu.mm/records/9230
3a071362-8a8d-4f66-a05f-3aa2fd90bf6c
b5144d1f-0ed3-48cc-9368-02b78557229c
None
Preview
Name / File License Actions
Yin Yin Myo Oo, Prof., Dept of Economics.pdf (193 KB)
license.icon
Publication type
Journal article
Upload type
Other
Title
Title An Analysis on Costs and Benefits of the No.1 Bayint Naung Bridge (1989/90- 2014/15)
Language en
Publication date 2017-12-01
Authors
Yin Myo Oo
Description
Within Yangon City, the No.1 Bayint Naung Bridge is one of the infrastructure projects implemented since the late 1990s. This study aims to examine mainly the monetary benefits as well as other economic and social advantages gained from the No.1 Bayint Naung Bridge in Yangon. To analyze costs and benefits of the Bridge, financial costs and benefits from the side of public sector are taken into consideration. Net Present Value Method, Benefit-Cost Ratio Method and Pay- back Period Method are used. From the NPV analysis, it was found that the bridge project is worth implemented. Result from Cost Benefit Analysis shows that total benefit is greater than total construction cost, so the project was cost effective. Pay-back period method also shows that it takes to recover.
Keywords
monetary benefits, costs and benefits analysis, net present value method, benefit - cost ratio method, pay-back period method
Journal articles
Meiktila University of Economics Research Journal
21-34
Vol. 8, N0.1
Back
0
0
views
downloads
See details
Views Downloads

Versions

Ver.1 2023-12-12 03:44:44.537339
Show All versions

Share

Mendeley Twitter Facebook Print Addthis

Export

OAI-PMH
  • OAI-PMH DublinCore
Other Formats
  • JSON

Confirm


Back to MERAL


Back to MERAL