MERAL Myanmar Education Research and Learning Portal
Item
{"_buckets": {"deposit": "1c9ff44b-9f93-44ae-9077-2772819d6f45"}, "_deposit": {"id": "3381", "owners": [], "pid": {"revision_id": 0, "type": "recid", "value": "3381"}, "status": "published"}, "_oai": {"id": "oai:meral.edu.mm:recid/3381", "sets": ["1597824273898", "user-ucsy"]}, "communities": ["ucsy"], "item_1583103067471": {"attribute_name": "Title", "attribute_value_mlt": [{"subitem_1551255647225": "Football Sport League Scheduling Technique using the Polygon Construction Method", "subitem_1551255648112": "en"}]}, "item_1583103085720": {"attribute_name": "Description", "attribute_value_mlt": [{"interim": "In the real world, the football sport leaguescheduling is very popular, while the people all overthe world are encouraging and watching footballmatches interestingly. The existing situationaccording to the program of matches or schedulemakes the football fans very interesting. Sportsleague scheduling is very important for bothprofessional and amateur sports alike. Obtaininggood “playable” schedules under a myriad of leagueand logistics constraints is extremely difficult yetessential to the success of the league. Like most teamsports, the location (home and away) at which thegame is played can significantly affect the outcomeof the game. The home team has advantage becausethey are most familiar with the venue and the awayteam has a disadvantage, they must unfamiliaritywith the venue. So balancing the number of games ateam plays at home and away is important to ensurefairness. In this paper, we have clearly explainedabout the polygon construction method to generatethe fair schedule."}]}, "item_1583103108160": {"attribute_name": "Keywords", "attribute_value": []}, "item_1583103120197": {"attribute_name": "Files", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_access", "date": [{"dateType": "Available", "dateValue": "2019-07-22"}], "displaytype": "preview", "download_preview_message": "", "file_order": 0, "filename": "psc2010paper (199).pdf", "filesize": [{"value": "98 Kb"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 98000.0, "url": {"url": "https://meral.edu.mm/record/3381/files/psc2010paper (199).pdf"}, "version_id": "0f3cb570-c803-4835-9e0f-59f4dfd75a81"}]}, "item_1583103131163": {"attribute_name": "Journal articles", "attribute_value_mlt": [{"subitem_issue": "", "subitem_journal_title": "Fifth Local Conference on Parallel and Soft Computing", "subitem_pages": "", "subitem_volume": ""}]}, "item_1583103147082": {"attribute_name": "Conference papers", "attribute_value_mlt": [{"subitem_acronym": "", "subitem_c_date": "", "subitem_conference_title": "", "subitem_part": "", "subitem_place": "", "subitem_session": "", "subitem_website": ""}]}, "item_1583103211336": {"attribute_name": "Books/reports/chapters", "attribute_value_mlt": [{"subitem_book_title": "", "subitem_isbn": "", "subitem_pages": "", "subitem_place": "", "subitem_publisher": ""}]}, "item_1583103233624": {"attribute_name": "Thesis/dissertations", "attribute_value_mlt": [{"subitem_awarding_university": "", "subitem_supervisor(s)": [{"subitem_supervisor": ""}]}]}, "item_1583105942107": {"attribute_name": "Authors", "attribute_value_mlt": [{"subitem_authors": [{"subitem_authors_fullname": "Aung, Moe Zaw"}]}]}, "item_1583108359239": {"attribute_name": "Upload type", "attribute_value_mlt": [{"interim": "Publication"}]}, "item_1583108428133": {"attribute_name": "Publication type", "attribute_value_mlt": [{"interim": "Article"}]}, "item_1583159729339": {"attribute_name": "Publication date", "attribute_value": "2010-12-16"}, "item_1583159847033": {"attribute_name": "Identifier", "attribute_value": "http://onlineresource.ucsy.edu.mm/handle/123456789/1138"}, "item_title": "Football Sport League Scheduling Technique using the Polygon Construction Method", "item_type_id": "21", "owner": "1", "path": ["1597824273898"], "permalink_uri": "http://hdl.handle.net/20.500.12678/0000003381", "pubdate": {"attribute_name": "Deposited date", "attribute_value": "2019-07-22"}, "publish_date": "2019-07-22", "publish_status": "0", "recid": "3381", "relation": {}, "relation_version_is_last": true, "title": ["Football Sport League Scheduling Technique using the Polygon Construction Method"], "weko_shared_id": -1}
Football Sport League Scheduling Technique using the Polygon Construction Method
http://hdl.handle.net/20.500.12678/0000003381
http://hdl.handle.net/20.500.12678/00000033815e418980-ec42-472b-8b08-7ad8ad439a3b
1c9ff44b-9f93-44ae-9077-2772819d6f45
Name / File | License | Actions |
---|---|---|
psc2010paper (199).pdf (98 Kb)
|
|