MERAL Myanmar Education Research and Learning Portal
Item
{"_buckets": {"deposit": "a1711764-b9a1-4d9b-bf05-0bded7b7f7f6"}, "_deposit": {"id": "1664", "owners": [], "pid": {"revision_id": 0, "type": "recid", "value": "1664"}, "status": "published"}, "_oai": {"id": "oai:meral.edu.mm:recid/1664", "sets": ["user-yueco"]}, "communities": ["yueco"], "control_number": "1664", "item_1583103067471": {"attribute_name": "Title", "attribute_value_mlt": [{"subitem_1551255647225": "A STUDY ON THE CAPACITY OF HYDRO ELECTRIC POWER GENERATION IN MYANMAR", "subitem_1551255648112": "en"}]}, "item_1583103085720": {"attribute_name": "Description", "attribute_value_mlt": [{"interim": "Increasing the electric power facilities of a country is the general expansion of the economy and it is one of the principle elements of the development programs. This study is focused on the fundamental source of electricity such as generation, consumption , transmission and unit losses over the period of 1988-2016 and based on secondary data. The objective of the study is to examine the production, consumption and distribution of Myanmar Electric Power Sector. Much more electricity is needed for transmission and distribution upgrade. Immediate investment in combined cycle gas generators are needed to boost output. Hydropower installed capacities are increased year by year. It is also found that the strength is high relevance for agricultural sector, weakness is trainings for hydropower professionals are not available, opportunity is international investment interest in Myanmar and threat is hydropower generation reduce in dry seasons. Although the government is trying to decreases the unit losses, are still high in Myanmar."}]}, "item_1583103108160": {"attribute_name": "Keywords"}, "item_1583103120197": {"attribute_name": "Files", "attribute_type": "file", "attribute_value_mlt": [{"accessrole": "open_access", "date": [{"dateType": "Available", "dateValue": "2020-05-05"}], "displaytype": "preview", "download_preview_message": "", "file_order": 0, "filename": "Wai Phyo Oo MEcon.pdf", "filesize": [{"value": "1532 Kb"}], "format": "application/pdf", "future_date_message": "", "is_thumbnail": false, "licensetype": "license_free", "mimetype": "application/pdf", "size": 1532000.0, "url": {"url": "https://meral.edu.mm/record/1664/files/Wai Phyo Oo MEcon.pdf"}, "version_id": "42ee1b8b-50c2-4304-b7ec-846fee61fd12"}]}, "item_1583103131163": {"attribute_name": "Journal articles", "attribute_value_mlt": [{"subitem_journal_title": "Yangon University of Economics"}]}, "item_1583103147082": {"attribute_name": "Conference papaers", "attribute_value_mlt": [{}]}, "item_1583103211336": {"attribute_name": "Books/reports/chapters", "attribute_value_mlt": [{}]}, "item_1583103233624": {"attribute_name": "Thesis/dissertations", "attribute_value_mlt": [{"subitem_supervisor(s)": []}]}, "item_1583105942107": {"attribute_name": "Authors", "attribute_value_mlt": [{"subitem_authors": [{"subitem_authors_fullname": "WAI PHYO OO"}]}]}, "item_1583108359239": {"attribute_name": "Upload type", "attribute_value_mlt": [{"interim": "Publication"}]}, "item_1583108428133": {"attribute_name": "Publication type", "attribute_value_mlt": [{"interim": "Thesis"}]}, "item_1583159729339": {"attribute_name": "Publication date", "attribute_value": "2019-09"}, "item_1583159847033": {"attribute_name": "Identifier", "attribute_value": "https://ecor.yueco.edu.mm/handle/123456789/291"}, "item_title": "A STUDY ON THE CAPACITY OF HYDRO ELECTRIC POWER GENERATION IN MYANMAR", "item_type_id": "21", "owner": "1", "path": ["1582965484782"], "permalink_uri": "http://hdl.handle.net/20.500.12678/0000001664", "pubdate": {"attribute_name": "Deposited date", "attribute_value": "2020-03-05"}, "publish_date": "2020-03-05", "publish_status": "0", "recid": "1664", "relation": {}, "relation_version_is_last": true, "title": ["A STUDY ON THE CAPACITY OF HYDRO ELECTRIC POWER GENERATION IN MYANMAR"], "weko_shared_id": -1}
A STUDY ON THE CAPACITY OF HYDRO ELECTRIC POWER GENERATION IN MYANMAR
http://hdl.handle.net/20.500.12678/0000001664
http://hdl.handle.net/20.500.12678/000000166493e2aa62-823d-42b9-adf1-b60efc3abe40
a1711764-b9a1-4d9b-bf05-0bded7b7f7f6
Name / File | License | Actions |
---|---|---|
![]() |
|
Publication type | ||||||
---|---|---|---|---|---|---|
Thesis | ||||||
Upload type | ||||||
Publication | ||||||
Title | ||||||
Title | A STUDY ON THE CAPACITY OF HYDRO ELECTRIC POWER GENERATION IN MYANMAR | |||||
Language | en | |||||
Publication date | 2019-09 | |||||
Authors | ||||||
WAI PHYO OO | ||||||
Description | ||||||
Increasing the electric power facilities of a country is the general expansion of the economy and it is one of the principle elements of the development programs. This study is focused on the fundamental source of electricity such as generation, consumption , transmission and unit losses over the period of 1988-2016 and based on secondary data. The objective of the study is to examine the production, consumption and distribution of Myanmar Electric Power Sector. Much more electricity is needed for transmission and distribution upgrade. Immediate investment in combined cycle gas generators are needed to boost output. Hydropower installed capacities are increased year by year. It is also found that the strength is high relevance for agricultural sector, weakness is trainings for hydropower professionals are not available, opportunity is international investment interest in Myanmar and threat is hydropower generation reduce in dry seasons. Although the government is trying to decreases the unit losses, are still high in Myanmar. | ||||||
Identifier | https://ecor.yueco.edu.mm/handle/123456789/291 | |||||
Journal articles | ||||||
Yangon University of Economics | ||||||
Conference papaers | ||||||
Books/reports/chapters | ||||||
Thesis/dissertations |